Blog/Network

Closing the ring: our 2025 network refresh

4 December 2025·5 min read·My Hosting Space team

New PoPs at Telehouse North and Datum MCR1 turn our network into a resilient UK ring. Here's what changed and why.

In Q3 2021 we moved from a managed, dual-homed service to our own IP core on AS48070, with transit from Telia and Cogent and peering at LINX and LONAP. That design served us well, and in Q4 2025 we built on what we learned from it.

Pushing the core closer to the interconnection points

We added points of presence at Telehouse North in London and Datum MCR1 in Manchester. Linked back to Peterborough, they form a ring over geographically diverse routes, so losing a single path no longer means losing reach.

A hardware refresh at the same time

Alongside the new PoPs we refreshed our routing and switching hardware. That gives us higher port density in a smaller space and power footprint, and room for 100G customer ports.

What it means for customers

  • Lower latency to the London and Manchester ecosystems
  • Diverse paths for transit and L2 backhaul
  • Cross-connect and L2 options at three sites instead of one