Blog
News and views from the hangar
Network upgrades, data centre engineering and plain-English explainers from the My Hosting Space team.
How our solar farm powers your rack
Our own 200kW solar farm supplies the data centre directly, with renewable grid energy for the rest.
Read article →95th percentile billing, explained
Why we bill IP transit on the 95th percentile, how it's calculated, and how to forecast your bill before month end.
Read article →Closing the ring: our 2025 network refresh
New PoPs at Telehouse North and Datum MCR1 turn our network into a resilient UK ring. Here's what changed and why.
Read article →Inside our water-cooled RDHX data hall
Rear-door heat exchangers let us run dense racks efficiently. A look at how the hall works and what it means for colocation.
Read article →